CON-AID integrates easily into conventional road construction without requiring special equipment or processes. It can be mixed with water and applied using standard machinery like tractors or roto-mixers, aligning with familiar rehabilitation methods. Construction can also be coordinated with existing road owner crews, cutting outsourcing needs and reducing overall costs. In some cases, CON-AID can even be applied to finished road surfaces with minimal disruption to traffic or road operations.
Standard Equipment
CON-AID integrates with standard roadbuilding machinery, requiring no specialized tools or modifications to existing fleet operations.
Reduces Project Costs
Enables efficient use of internal crews, lowering reliance on external contractors and minimizing overall construction expenditures.
Minimal Disruption
Application can occur on finished surfaces with limited disruption, maintaining traffic flow and avoiding extended road closures.
Construction Method
A Straightforward Process. Long-Lasting Results.
CON-AID is applied using standard roadbuilding equipment and a proven seven-step process. No specialized tools or major disruption required.

STEP 01
PREPARE
Clear the ditches and pull the shoulders to shape the road.

STEP 02
SCARIFY
Scarify the road too a depth of 20 cm.

STEP 03
APPLY CON-AID
Add the recommended amount of CON-AID to water, spray evenly over the scarified area, and bring the soil to just above optimum moisture content.

STEP 04
MIX
Mix the scarified layer thoroughly and evenly to achieve consistent moisture throughout.

STEP 05
Shape
Shape the road and compact it, ensuring a 4% crown.

STEP 06
Roll
Finish with a pneumatic roller, adding water as needed.

STEP 07
cure
Apply a light mist of clean water daily for 7-10 days to support curing.
Construction Method
PREPARE
Prepare the road by clearing the ditches and pulling shoulders, shape the road.
SCARIFY
Scarify the road to a depth of 20 cm.
CON-AID
Add the recommended amount of Con-Aid to the water in the spray truck and spread evenly over the scarified area. Add more water if necessary to bring the moisture content of the soil to just above OMC.
MIX
Mix the scarified layer (20 cm) thoroughly and evenly with the tractor and disc or mixer to ensure that the moisture content is even throughout the layer.
SHAPE
Shape and compact the road, ensuring a 4% crown.
ROLLING
Finish rolling the surface with a pneumatic roller, adding water as needed. Note that once Con-Aid is applied, the road will dry quickly.
SPRAY
Spray a light mist of clean water onto the treated surface once a day for 7–10 days after application. This step is essential, as it helps support and complete the curing process.